Material Handling

Material Handling

We made sure we had adequate equipment and plenty of space to allow material handling.

We built our shop at GehlPRO Welding so that it could be ready for growth on day 1. We made sure we had adequate equipment and plenty of space to allow material handling. Some of our facility highlights include:

  • Several Forklifts (Iargest with 17,500 lb capacity), including an electric forklift (3000 lb capacity)
  • Cantilever racking, accommodating storage of materials up to 6x12 ft sheets
  • Bar racking, accommodating storage of materials up to 40 ft lengths
  • Painting, finishing, and delivery capabilities

Back to Top ↑Back to Top ↑